Agenda item

A2: 08/00433/FULMAJ - Land to rear of 243-289 Preston Road, Clayton-le-Woods

Report of Corporate Director (Business) (enclosed).

Decision:

Planning permission granted subject to a Legal Agreement.

Minutes:

(The Committee received representations from an objector to the proposals)

 

Application No:                  08/00203/FULMAJ

Proposal:                   Erection of 25 residential properties, access alteration and provision of existing residents parking.

Location:                    Land to rear of 243 – 289, Preston Road, Clayton-Le-Woods

Decision:

It was proposed by Councillor Adrian Lowe, seconded by Councillor Harold Heaton, and was subsequently RESOLVED (10:3) to grant planning permission subject to a Legal Agreement and the following conditions:

 

1. The proposed development must be begun not later than three years from the date of this permission.

Reason: Required to be imposed by Section 51 of the Planning and Compulsory Purchase Act 2004.

 

2. No development shall take place until a scheme of landscaping has been submitted to and approved in writing by the Local Planning Authority, notwithstanding any such detail, which may have previously been submitted.  The scheme shall indicate all existing trees and hedgerows on the land; detail any to be retained, together with measures for their protection in the course of development; indicate the types and numbers of trees and shrubs to be planted, their distribution on site, those areas to be seeded, paved or hard landscaped; and detail any changes of ground level or landform.

Reason: In the interests of the amenity of the area and in accordance with Policy No.GN5 of the Adopted Chorley Borough Local Plan Review.

 

3. All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding seasons following the occupation of any buildings or the completion of the development, whichever is the sooner, and any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority gives written consent to any variation.

Reason:  In the interest of the appearance of the locality and in accordance with Policy No GN5 of the Adopted Chorley Borough Local Plan Review.

 

4. The development hereby permitted shall not commence until full details of the colour, form and texture of all external facing materials to the proposed buildings (notwithstanding any details shown on the previously submitted plans and specification) have been submitted to and approved in writing by the Local Planning Authority.  The development shall only be carried out using the approved external facing materials.

Reason:  To ensure that the materials used are visually appropriate to the locality and in accordance with Policy Nos. GN5 and HS4 of the Adopted Chorley Borough Local Plan Review.

 

5. The development hereby permitted shall not commence until full details of the colour, form and texture of all hard ground- surfacing materials (notwithstanding any such detail shown on previously submitted plans and specification) have been submitted to and approved in writing by the Local Planning Authority.  The development shall only be carried out in conformity with the approved details.

Reason:  To ensure a satisfactory form of development in the interest of the visual amenity of the area and in accordance with Policy Nos. GN5 and HS4 of the Adopted Chorley Borough Local Plan Review.

 

6. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995, (Schedule 2, Part 1, Classes A to E), or any Order amending or revoking and re-enacting that Order, no alterations or extensions shall be undertaken to the dwelling(s) hereby permitted, or any garage, shed or other outbuilding erected (other than those expressly authorised by this permission).

Reason: To protect the appearance of the locality and in accordance with Policy No. HS4 of the Adopted Chorley Borough Local Plan Review.

 

7. Before the development hereby permitted is first commenced, full details of the position, height and appearance of all fences and walls to be erected (notwithstanding any such detail shown on previously submitted plans) shall have been submitted to and approved in writing by the Local Planning Authority.  No dwelling shall be occupied until all fences and walls shown in the approved details to bound its plot have been erected in conformity with the approved details.  Other fences and walls shown in the approved details shall have been erected in conformity with the approved details prior to substantial completion of the development.

Reason:  To ensure a visually satisfactory form of development, to provide reasonable standards of privacy to residents and in accordance with Policy No. HS4 of the Adopted Chorley Borough Local Plan Review.

 

8. Prior to the commencement of the development a geotechnical investigation of the slopes adjacent to the application site shall be undertaken to ensure the stability of the slope. The investigation shall also include the trees located to the south west boundary to assess the long term impact of the regrading and any safety implications. This investigation shall be submitted to and approved in writing by the Local Planning Authority. Any remedial works required to ensure the continued stability of the ground shall be implemented prior to the commencement of development of the site.

Reason: To ensure the continued stability of the surrounding land and in accordance with Policy EP15 of the Adopted Chorley Borough Local Plan Review

 

9. No development shall take place until details of the proposed surface water drainage arrangements have been submitted to and approved by the Local Planning Authority in writing.  No part of the development shall be occupied until the approved surface water drainage arrangements have been fully implemented.

Reason: To secure proper drainage and to prevent flooding and in accordance with Policy Nos. EP18 of the Adopted Chorley Borough Local Plan Review, Policy 24 of the Joint Lancashire Structure Plan and Government advice contained in PPS25: Development and Flood Risk

 

10. Prior to the commencement of the development full details of the Management Company to deal with the future management and maintenance of the site shall be submitted to and approved in writing by the Local Planning Authority. The details shall include the future management of the proposed existing residents parking spaces detailed on plans reference 07/029 AL0001A. The site shall thereafter be managed by the approved Management Company.

Reason: To ensure the satisfactory management of the private driveway, residents parking spaces  and refuse storage/ collection at the site and in accordance with Policy TR4 of the Adopted Chorley Borough Local Plan Review.

 

11. No development shall take place until :

(a) methodology for investigation and assessment of ground contamination has been submitted to and approved in writing by the Local Planning Authority.  The investigation and assessment shall be carried out in accordance with current best practice including British Standard 10175:2001 “Investigation of potentially contaminated sites – Code of Practice”.  The objectives of the investigation shall be, but not limited to, identifying the type(s), nature and extent of contamination present to the site, risks to receptors and potential for migration within and beyond the site boundary;

 

(b) all testing specified in the approved scheme  (submitted under a) and the results of the investigation and risk assessment, together with remediation proposals to render the site capable of development have been submitted to the Local Planning Authority;

 

(c) the Local Planning Authority has given written approval to the remediation proposals (submitted under b), which shall include an implementation timetable and monitoring proposals.  Upon completion of the remediation works, a validation report containing any validation sampling results have been submitted to and approved in writing by the Local Planning Authority.

Reason: To protect the environment and prevent harm to human health by ensuring that the land is remediated to an appropriate standard for the proposed end use and in accordance with Government advice contained in PPS23: Planning and Pollution Control

 

12. The development hereby permitted shall only be carried out in conformity with the proposed ground and building slab levels shown on the approved plans or as may otherwise be agreed in writing with the Local Planning Authority before any development is first commenced.

Reason:  To protect the appearance of the locality and in the interests of the amenities of local residents and in accordance with Policy Nos. GN5 and HS4 of the Adopted Chorley Borough Local Plan Review.

 

13. No dwelling hereby permitted shall be occupied until that part of the service road which provides access to it from the public highway has been constructed in accordance with the approved plans.

Reason:  In the interests of highway safety and in accordance with Policy No.TR4 of the Adopted Chorley Borough Local Plan Review.

 

14. No dwelling hereby permitted shall be occupied until the highway alterations to the site access and Preston Road have been completed in accordance with the details shown on plan reference AL(00)-001 , or as otherwise agreed in writing by the Local Planning Authority.

Reason:  In the interests of highway safety and in accordance with Policy No.TR4 of the Adopted Chorley Borough Local Plan Review.

 

15. If, during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the Local Planning Authority) shall be carried out until the developer has submitted, and obtained written approval from the Local Planning Authority for, an amendment to the Method Statement detailing how this unsuspected contamination shall be dealt with.

Reason: To protect the environment and prevent harm to human health by ensuring that the land is remediated to an appropriate standard for the proposed end use and in accordance with Government advice contained in PPS23: Planning and Pollution Control

 

16. Surface water must drain separate from the foul and no surface water will be permitted to discharge to the foul sewerage system.

Reason: To secure proper drainage and in accordance with Policy Nos. EP17 of the Adopted Chorley Borough Local Plan Review.

Supporting documents: