Agenda item

08/01253/OUTMAJ - Waggon and Horses Public House, 2, Coppull Moor Lane, Coppull, Chorley

Report of Corporate Director (Business) (enclosed)

Decision:

Outline planning permission granted subject to a Section 106 Agreement and conditions.

Minutes:

Application no:                      08/01253/OUTMAJ

Proposal:                   Outline application for residential development for 33 dwellings including access and scale.

Location:                    Waggon and Horses Public House, 2, Coppull Moor Lane, Coppull, Chorley

Decision:

It was proposed by Councillor Harold Heaton, seconded by Councillor David Dickinson, and was subsequently RESOLVED to grant outline planning permission subject to the signing of a S106 Agreement that would include the provision for traffic calming measures on Chapel Lane, the details of which to be delegated to the Corporate Director (Business) in consultation with the Chair and Vice Chair of the Committee, and the following conditions:

 

1. The proposed development must be begun not later than three years from the date of this permission.

Reason: Required to be imposed by Section 51 of the Planning and Compulsory Purchase Act 2004.

 

2. Before the development hereby permitted is first commenced, full details of all reserved matters (namely the siting, design, external appearance of the buildings, the means of access thereto and the landscaping of the site) shall be submitted to and approved in writing by the Local Planning Authority.

Reason: The permission is in outline only and in accordance with Policy Nos. GN5, HS4 and TR4 of the Adopted Chorley Borough Local Plan Review.

 

3. No development approved by this permission shall be commenced until a scheme for the disposal of foul and surface waters has been approved in writing by the Local Planning Authority.  Such a scheme shall be constructed and completed in accordance with the approved plans.

Reason : To ensure a satisfactory means of drainage and in accordance with Policy No. EP18 of the Adopted Chorley Borough Local Plan Review.

 

4. No development shall take place until:

 

a methodology for investigation and assessment of ground contamination has been submitted to and approved in writing by the Local Planning Authority.  The investigation and assessment shall be carried out in accordance with current best practice including British Standard 10175:2001 “Investigation of potentially contaminated sites – Code of Practice”.  The objectives of the investigation shall be, but not limited to, identifying the type(s), nature and extent of contamination present to the site, risks to receptors and potential for migration within and beyond the site boundary;

 

all testing specified in the approved scheme  (submitted under a) and the results of the investigation and risk assessment, together with remediation proposals to render the site capable of development have been submitted to the Local Planning Authority;

 

the Local Planning Authority has given written approval to the remediation proposals (submitted under b), which shall include an implementation timetable and monitoring proposals.  Upon completion of the remediation works, a validation report containing any validation sampling results have been submitted to and approved in writing by the Local Planning Authority.

Reason: To protect the environment and prevent harm to human health by ensuring that the land is remediated to  an appropriate standard for the proposed end use and in accordance with the guidance set out in PPS23: Planning and Pollution Control

 

5. During the construction period, all trees to be retained shall be protected by 1.2 metre high fencing as specified in paragraph 8.2.2 of British Standard BS5837:2005 at a distance from the tree trunk equivalent to the outermost limit of the branch spread, or at a distance from the tree trunk equal to half the height of the tree (whichever is further from the tree trunk), or as may be first agreed in writing with the Local Planning Authority. No construction materials, spoil, rubbish, vehicles or equipment shall be stored or tipped within the area(s) so fenced.  All excavations within the area so fenced shall be carried out by hand.

Reason: To safeguard the trees to be retained and in accordance with Policy No. EP9 of the Adopted Chorley Borough Local Plan Review.

 

6. Before the demolition of the buildings on the site the survey for the possible presence of roosting bats as recommended in Section 5.2 of the report prepared by Environmental Research and Advisory Partnership received on the 23rd December 2008 shall be carried out and the results submitted to and agreed in writing by the Local Planning Authority.  Any mitigation measures found to be necessary shall be agreed in writing by the Local Planning Authority and implemented before development on the site commences.

Reason: To secure the protection of vulnerable species in accordance with Policy EP4 of the Adopted Chorley Borough Local Plan Review.

 

7. Notwithstanding the submitted illustrative layout the access details shown on the plan do not form part of this permission.

Reason: For the avoidance of doubt and in accordance with Policy TR 4 of the Adopted Chorley Borough Local Plan Review.

Supporting documents: