Agenda item

09/00180/FULMAJ - Land 100m East of 3 Crompton Walk, Buckshaw Avenue, Buckshaw Village, Lancashire

Report of Corporate Director (Business) (enclosed)

Decision:

Planning permission granted subject to conditions.

Minutes:

Application no:                      09/00180/FULMAJ

Proposal:                   Erection of primary school with associated playing fields, 2.4 metre high boundary fence and car park at Buckshaw Village

Location:                    Land 100m East of 3 Crompton Walk, Buckshaw Avenue, Buckshaw Village, Lancashire

Decision:

It was proposed by Councillor David Dickinson, seconded by Councillor Simon Moulton, and was subsequently RESOLVED to grant planning permission subject to the following conditions:

 

1. The proposed development must be begun not later than three years from the date of this permission.

Reason: Required to be imposed by Section 51 of the Planning and Compulsory Purchase Act 2004.

 

2. Before the development hereby permitted is first commenced full details of existing and proposed ground levels and proposed building slab levels (all relative to ground levels adjoining the site) shall have been submitted to and approved in writing by the Local Planning Authority, notwithstanding any such detail shown  on previously submitted plans.  The development shall only be carried out in conformity with the approved details.

Reason:  To protect the appearance of the locality and in accordance with Policy Nos. GN5 of the Adopted Chorley Borough Local Plan Review.

 

3. Before the development hereby permitted is first commenced, full details of the position, height and appearance of all fences and walls to be erected on the site (notwithstanding any such detail shown on previously submitted plans) shall have been submitted to and approved in writing by the Local Planning Authority. In particular the details shall include the full specification of the 2.4 metre high site boundary fence. No building shall be occupied or land used pursuant to this permission before all walls and fences have been erected in accordance with the approved details.  Fences and walls shall thereafter be retained in accordance with the approved details at all times.

Reason:  To ensure a visually satisfactory form of development, to protect the amenities of occupiers of nearby property and in accordance with Policy Nos. GN5 of the Adopted Chorley Borough Local Plan Review.

 

4. No development shall take place until a scheme of landscaping has been submitted to and approved in writing by the Local Planning Authority, notwithstanding any such detail which may have previously been submitted.  The scheme shall indicate all existing trees and hedgerows on the land; detail any to be retained, together with measures for their protection in the course of development; indicate the types and numbers of trees and shrubs to be planted, their distribution on site, those areas to be seeded, paved or hard landscaped; and detail any changes of ground level or landform.

Reason: In the interests of the amenity of the area and in accordance with Policy No.GN5 of the Adopted Chorley Borough Local Plan Review.

 

5. All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding seasons following the occupation of any buildings or the completion of the development, whichever is the sooner, and any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority gives written consent to any variation.

Reason:  In the interest of the appearance of the locality and in accordance with Policy No GN5 of the Adopted Chorley Borough Local Plan Review.

 

6. The development hereby permitted shall not commence until full details of the colour, form and texture of all external facing materials to the proposed building (notwithstanding any details shown on the previously submitted plans and specification) have been submitted to and approved in writing by the Local Planning Authority.  The development shall only be carried out using the approved external facing materials.

Reason:  To ensure that the materials used are visually appropriate to the locality and in accordance with Policy Nos. GN5 of the Adopted Chorley Borough Local Plan Review.

 

7. The development hereby permitted shall not commence until full details of the colour, form and texture of all hard ground- surfacing materials (notwithstanding any such detail shown on previously submitted plans and specification) have been submitted to and approved in writing by the Local Planning Authority.  The development shall only be carried out in conformity with the approved details.

Reason:  To ensure a satisfactory form of development in the interest of the visual amenity of the area and in accordance with Policy Nos. GN5 of the Adopted Chorley Borough Local Plan Review.

 

8. Prior to the commencement of the development full details of the renewable and low carbon technology to be incorporated into the building shall be submitted to and approved in writing by the Local Planning Authority. The development thereafter shall incorporate the approved details, unless otherwise agreed in writing by the Local Planning Authority.

Reason: To ensure the proper planning of the area. In line with the objective of National Planning Policy contained in Planning Policy Statement: Planning, the Climate Change Supplement to PPS1, Policies EM16 and EM17 of the Regional Spatial Strategy and Chorley Borough Council's Sustainable Resources DPD

9. No development shall take place until details of the proposed surface water drainage arrangements for the playing pitches/ fields have been submitted to and approved by the Local Planning Authority in writing.  No part of the development shall be occupied until the approved surface water drainage arrangements have been fully implemented.

Reason: To secure proper drainage and to prevent flooding and in accordance with Policy Nos. EP18 of the Adopted Chorley Borough Local Plan Review.

 

10. Surface water must drain separate from the foul and no surface water will be permitted to discharge to the foul sewerage system.

Reason: To secure proper drainage and in accordance with Policy Nos. EP17 of the Adopted Chorley Borough Local Plan Review.

Supporting documents: