Agenda item

09/00780/FUL - Land 50m South of 54 to 64 Lancaster Lane, Clayton-le-Woods, Lancashire

Report of Corporate Director (Business) (enclosed).

 

Decision:

Planning permission granted subject to a Legal Agreement

Minutes:

Application no:                      09/00780/FUL

Proposal:                   Erection of 3 detached dwellings and associated infrastructure on land to rear of 54 to 64 Lancaster Lane (extension previously permitted scheme, utilising access road approved by 09/00354/FULMAJ)  

Location:                    Land 50m South of 54 to 64, Lancaster Lane, Clayton-Le-Woods

Decision:

It was proposed by Councillor Keith Iddon, seconded by Councillor Dennis Edgerley, and was subsequently RESOLVED (10:6) to grant planning permission, with Councillors Henry Caunce, Mike Devaney, Dennis Edgerley, Harold Heaton, Keith Iddon, Roy Lees, June Molyneaux, Simon Moulton, Mick Muncaster and Geoff Russell voting for the proposal and Councillors Julia Berry, Judith Boothman, Alistair Bradley, David Dickinson, Chris France and Ralph Snape voting against the proposal, (Councillor Ken Ball abstained from the vote) subject to a Legal Agreement and the following conditions:

 

1. The proposed development must be begun not later than three years from the date of this permission.

Reason: Required to be imposed by Section 51 of the Planning and Compulsory Purchase Act 2004.

 

2. Surface water must drain separate from the foul and no surface water will be permitted to discharge to the foul sewerage system.

Reason: To secure proper drainage and in accordance with Policy Nos. EP17 of the Adopted Chorley Borough Local Plan Review.

 

3. The garages hereby permitted shall be kept freely available for the parking of cars, notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995.

Reason:  To ensure adequate garaging/off street parking provision is made/maintained and thereby avoid hazards caused by on-street parking and in accordance with Policy No. TR4 of the Adopted Chorley Borough Local Plan Review

 

4. The development shall be carried out in accordance with the ground investigation report Ref 06203 and its associated addendum report.

Reason: In the interests of safety and in accordance with PPS23.

 

5. No dwelling hereby permitted shall be occupied until that part of the road which provides access to it from the public highway has been constructed in accordance with the approved plans and the approved planning application reference 07/00685/FUL.

Reason:  In the interests of highway safety and in accordance with Policy No.TR4 of the Adopted Chorley Borough Local Plan Review.

 

6. Prior to the commencement of the development full details of the predicted energy use of the development expressed in terms of carbon emissions shall be submitted to an approved in writing by the Local Planning Authority. If no data specific to the application is available benchmark data will be acceptable. A schedule should include how energy efficiency is being addressed, for example, amongst other things through the use of passive solar design. It will be flexible enough to show the on-site measures to be installed and implemented so as to reduce carbon emissions in accordance with policy SR1 of the Sustainable Resources DPD. No development shall commence until the scheme has been submitted to and approved in writing by the Local Planning Authority. Such details as may be approved shall be implemented and retained in perpetuity unless otherwise agreed in writing by the Local Planning Authority.

Reason: To ensure the proper planning of the area. In line with the objective of National Planning Policy contained in Planning Policy Statement: Planning, the Climate Change Supplement to PPS1, Policies EM16 and EM17 of the Regional Spatial Strategy and Chorley Borough Council's Sustainable Resources DPD and Supplementary Planning Document.

 

7. No dwelling hereby permitted shall be occupied until the cycle/storage (garden sheds) as shown on drawing no AL007 Rev D stamp dated 23rd November 2009 have been provided for each of the properties.

Reason: The garages are smaller than would normally be provided and therefore to ensure sufficient storage/cycle storage is provided at the properties in accordance with Manual for Streets.

 

8. The development hereby permitted shall not commence until samples of all external facing materials to the proposed building(s) (notwithstanding any details shown on previously submitted plan(s) and specification) have been submitted to and approved in writing by the Local Planning Authority.  The development shall only be carried out using the approved external facing materials.

Reason:  To ensure that the materials used are visually appropriate to the locality and in accordance with Policy Nos. GN5 of the Adopted Chorley Borough Local Plan Review.

 

9. Before the development hereby permitted is first commenced, full details of the position, height and appearance of all fences and walls to be erected (notwithstanding any such detail shown on previously submitted plans) shall have been submitted to and approved in writing by the Local Planning Authority.  No dwelling shall be occupied until all fences and walls shown in the approved details to bound its plot have been erected in conformity with the approved details.  Other fences and walls shown in the approved details shall have been erected in conformity with the approved details prior to substantial completion of the development.

Reason:  To ensure a visually satisfactory form of development, to provide reasonable standards of privacy to residents and in accordance with Policy No. HS4 of the Adopted Chorley Borough Local Plan Review.

 

10. The development hereby permitted shall not commence until full details of the colour, form and texture of all hard ground- surfacing materials (notwithstanding any such detail shown on previously submitted plans and specification) have been submitted to and approved in writing by the Local Planning Authority.  The development shall only be carried out in conformity with the approved details.

Reason:  To ensure a satisfactory form of development in the interest of the visual amenity of the area and in accordance with Policy Nos. GN5 and HS4 of the Adopted Chorley Borough Local Plan Review.

 

11. Before the development hereby permitted is first commenced full details of existing and proposed ground levels and proposed building slab levels (all relative to ground levels adjoining the site) shall have been submitted to and approved in writing by the Local Planning Authority, notwithstanding any such detail shown  on previously submitted plans.  The development shall only be carried out in conformity with the approved details.

Reason:  To protect the appearance of the locality, in the interests of the amenities of local residents and in accordance with Policy Nos. GN5 and HS4 of the Adopted Chorley Borough Local Plan Review.

Supporting documents: