Agenda item

A3: 06/00676/REMMAJ - Parcel H7, Buckshaw Village, Euxton Lane, Euxton

Minutes:

Application No:            06/00676/REMMAJ

Proposal:                   Erection of 106 dwellings with associated landscaping, parking, bin stores, roads and sewers.

Location:                    Parcel H7 Buckshaw Village, Euxton Lane, Euxton

Decision:

It was proposed by Councillor A Lowe, seconded by Councillor D Gee, and subsequently RESOLVED to grant the reserved matters application subject to the following conditions:

1. The development shall only be carried out in accordance with the approved plans, except as may otherwise be specifically required by any other condition of the outline planning permission or this approval of reserved matters or unless otherwise first agreed in writing by the Local Planning Authority.

Reason: To define the permission and in the interests of the proper development of the site.

 

2. Before the development hereby permitted is first commenced full details of existing and proposed ground levels and proposed building slab levels (all relative to ground levels adjoining the site) shall have been submitted to and approved in writing by the Local Planning Authority, notwithstanding any such detail shown  on previously submitted plan(s).  The development shall only be carried out in conformity with the approved details.

Reason:  To protect the appearance of the locality, in the interests of the amenities of local residents and in accordance with Policy Nos. GN5 and HS4 of the Adopted Chorley Borough Local Plan Review.

 

3. Before the development hereby permitted is first occupied, provision for cycle parking provision, in accordance with details to be first agreed in writing with the Local Planning Authority, shall have been made.

Reason: To ensure adequate on site provision for cycle parking an in accordance with Policy No. TR18 of the Adopted Chorley Borough Local Plan Review.

 

4. No development shall take place until a scheme of landscaping has been submitted to and approved in writing by the Local Planning Authority, notwithstanding any such detail which may have previously been submitted.  The scheme shall indicate all existing trees and hedgerows on the land; detail any to be retained, together with measures for their protection in the course of development; indicate the types and numbers of trees and shrubs to be planted, their distribution on site, those areas to be seeded, paved or hard landscaped; and detail any changes of ground level or landform.

Reason: In the interests of the amenity of the area and in accordance with Policy No.GN5 of the Adopted Chorley Borough Local Plan Review.

 

5. All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding seasons following the occupation of any buildings or the completion of the development, whichever is the sooner, and any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority gives written consent to any variation.

Reason:  In the interest of the appearance of the locality and in accordance with Policy No GN5 of the Adopted Chorley Borough Local Plan Review.

 

6. The development hereby permitted shall not commence until samples of all external facing materials to the proposed building(s) (notwithstanding any details shown on previously submitted plan(s) and specification) have been submitted to and approved in writing by the Local Planning Authority.  The development shall only be carried out using the approved external facing materials.

Reason:  To ensure that the materials used are visually appropriate to the locality and in accordance with Policy Nos. GN5 and HS4 of the Adopted Chorley Borough Local Plan Review.

 

7. The development hereby permitted shall not commence until full details of the colour, form and texture of all hard ground-surfacing materials (notwithstanding any such detail shown on previously submitted plans and specification) have been submitted to and approved in writing by the Local Planning Authority, The Development shall only be carried out in conformity with the approved details.

Reason: To ensure a satisfactory forn of development in the interest of the visual amenity of the area and in accordance with Policy Nos. GN5 and HS4 of the Adopted Chorley Borough Local Plan Review.

 

8. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (Schedule 2, Part 1, Class A to D) or any Order revoking or re-enacting the Order, no alterations or extensions shall be undertaken to any dwelling hereby permitted.

Reason: To protect the appearance of the locality and in accordance with Policy No. HS4 of the Adopted Chorley Borough Local Plan Review.

 

9. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (Schedule 2, Part 2, Class A) (or any Order revoking and re-enacting that Order) no fences, gates or walls shall be erected within the curtilage of any dwelling hereby permitted (other than those expressly authorised by this permission).

Reason: To protect the appearance of the locality and in accordance with Policy No HS4 of the Adopted Chorley Borough Local Plan Review.

 

10. No development shall take place until:

 

a) The Local Planning Authority have given written approval to the development proceeding having regard to the results of the monitoring exercise and the recommendations and proposals as specified in the ENCIA report 2306/11/KL dated 31st January 2006 and report 2306/11/RGA dated 26th June 2006 (gas appraisal and revised gas appraisal, respectively). This includes the incorporation of a comprehensive construction design, to prevent the ingress of ground gas.  Details of the proposed gas control measures should be sent to the Local Planning Authority for approval prior to the commencement of the development.

b) With respect to the above condition this proposed development requires a plot specific gas risk assessment, which should be submitted to the Local Planning Authority in accordance with recommendations made in the revised gas appraisal report. This risk assessment shall include risk, and risk reduction where required, due to gas from any potential sources discovered through Encia's gas appraisal. No buildings or building infrastructure works shall be started on site until this plot by plot risk assessment has been received and approved by the Local Planning Authority. All precautionary measures recommended in the consultant’s report shall be carried out in the course of the development unless agreed in writing with the Local Planning Authority.

Reason: In the interests of safety and in accordance with Policy No. EP16 of the adopted Chorley Borough Local Plan Review. 

 

11. The approved plans are:

Plan Ref.                                Received On:                   Title:

BV-H7-11-02-002                         03 August 2006                                      Site Layout

205629/206                      03 August 2006                   Large Refuse Vehicle Swept Path

Design Statement     14 August       Design Statement Buckshaw Parcel H7

Reason:  To define the permission and in the interests of the proper development of the site.

Supporting documents: