Agenda item

A1:07/00384/FULMAJ - Land Adjacent Railway, Stump Lane, Chorley

Report of the Director of Development and Regeneration (enclosed)

Minutes:

(The Committee received representations from a Ward representative, Councillor D Edgerley)

 

Application No:                  07/00384/FULMAJ

Proposal:                   Construction of 3 industrial units with parking and ancillary facilities

Location:                    Land adjacent Railway. Stump Lane, Chorley

Decision:

It was proposed by Councillor A Lowe, seconded by Councillor D Gee, and subsequently RESOLVED (9:0) to grant full planning permission, subject to the following conditions) and further discussions with the applicants on the possibility of extra screening being provided on Brock Road:

 

1. The proposed development must be begun not later than three years from the date of this permission.

Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990.

 

2. The development hereby permitted shall not commence until full details of the colour, form and texture of all external facing materials to the proposed buildings have been submitted to and approved in writing by the Local Planning Authority.  The development shall only be carried out using the approved external facing materials.

Reason:  To ensure that the materials used are visually appropriate to the locality and in accordance with Policy No. GN5 and EM2 of the Adopted Chorley Borough Local Plan Review.

 

3. Before the development hereby permitted is first commenced, full details of the position, height and appearance of all fences and walls to be erected to the site boundaries shall have been submitted to and approved in writing by the Local Planning Authority.  No building shall be occupied or land used pursuant to this permission before all walls and fences have been erected in accordance with the approved details.  Fences and walls shall thereafter be retained in accordance with the approved details at all times.

Reason:  To ensure a visually satisfactory form of development, to protect the amenities of occupiers of nearby property and in accordance with Policy Nos. GN5 and EM2 of the Adopted Chorley Borough Local Plan Review.

 

4. No development shall take place until a scheme of landscaping has been submitted to and approved in writing by the Local Planning Authority, notwithstanding any such detail which may have previously been submitted.  The scheme shall indicate all existing trees and hedgerows on the land; detail any to be retained, together with measures for their protection in the course of development; indicate the types and numbers of trees and shrubs to be planted, their distribution on site, those areas to be seeded, paved or hard landscaped; and detail any changes of ground level or landform.

Reason: In the interests of the amenity of the area and in accordance with Policy No.GN5 of the Adopted Chorley Borough Local Plan Review.

 

5. All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding seasons following the occupation of any buildings or the completion of the development, whichever is the sooner, and any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority gives written consent to any variation.

Reason:  In the interest of the appearance of the locality and in accordance with Policy No GN5 of the Adopted Chorley Borough Local Plan Review.

 

6. No development approved by this permission shall be commenced until a scheme for the provision and implementation of a surface water regulation system has been approved by the Local Planning Authority.  The scheme shall be completed in accordance with the  approved plans.

Reason: Surface water run off from the site should be restricted to existing rates in order that the proposed development does not contribute to an increased risk of flooding.

 

7. Prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from parking areas shall be passed through gullies with an overall capacity compatible with the site being drained.

Reason: To prevent pollution of the water environment.

 

8. Unit 1 as shown on the submitted plan, shall only be used for B1 purposes as defined by the Town and Country Planning (Use Classes) Order 1987 and for no other purposes unless agreed in writing by the Local Planning Authority.

Reason: In the interests of the amenity of the area and in accordance with Policy EM2 of the Adopted Chorley Borough Local Plan Review.

 

9. Before the development hereby permitted is first commenced full details of existing and proposed ground levels and proposed building slab levels (all relative to ground levels adjoining the site) shall have been submitted to and approved in writing by the Local Planning Authority, notwithstanding any such detail shown  on previously submitted plan(s).  The development shall only be carried out in conformity with the approved details.

Reason:  To protect the appearance of the locality, in the interests of the amenities of local residents and in accordance with Policy Nos. GN5 of the Adopted Chorley Borough Local Plan Review.

 

10. Before the development hereby permitted is first occupied, the car park and vehicle manoeuvring areas shall be surfaced or paved, drained and marked out all in accordance with the approved plan.  The car park and vehicle manoeuvring areas shall not thereafter be used for any purpose other than the parking of and manoeuvring of vehicles.

Reason:  To ensure adequate on site provision of car parking and manoeuvring areas and in accordance with Policy No. TR8 of the Adopted Chorley Borough Local Plan Review.

Supporting documents: